Yes a toilet and/or shower can be added, we will do the trench work for foul and water services together with all connections to manhole as required. Building regulations will…
Faq Category: Office
What is the lead-time?
We are currently extremely busy, our current lead time is 3-4 months from placement of order.
What are the payment terms?
25% when the order is placed. 25% on completion of the foundations. 40% on completion of the structure, doors and windows. 10% on completion of the build.
Will the garden room add value to my property?
Our buildings are built to a high specification and will last for 50+ years, they are permanent buildings and will add between 80% > 100% of their cost price to…
Why do we build on a concrete slab foundation?
A reduced dig creates an internal floor to ceiling height of 2.15 metres. There is no void under the building avoiding rodents and foxes. No decking is required outside the…
Do I need Building Control?
Building Regulations do NOT apply if: The internal area is less than 15m2. If the Internal area is less than 30m2 and is not within 1 metre of the boundary.…