Multi-purpose Garden Room - Crawley

PROJECT OVERVIEW

A multi-purpose garden room with shower room has been built for our clients in Crawley.
Measuring 5.4m x 3.3m externally, this beautiful room is bespoke in design with plenty of windows to appreciate the views over the garden.
This garden room is clad in white Cedral Weatherboard, with its ‘0’ rating for fire and its painted finish which will not fade, it is a practical, contemporary product.
For all garden rooms which have drainage connecting to the mains services, Building Control is required, EGR’s arrange this as part of the project.
Laminate flooring in the main room and tiles in the shower room, create a practical solution.
The electrical package includes connection to the consumer unit in the clients house, together with power sockets, heater, LED down lights, external security light, smoke detector and Cat6a data point.
We dismantled the existing garage and removed it from site as part of our Turnkey Service. We also laid an additional foundation for a garden shed to the rear of the garden room.
Build time 3 weeks.
Photos are pre-landscaping.
Feedback:-


We had a single garage in need of demolition. We wanted to replace it with a multi-use space that would serve as a home office, a sewing room, a play room, a guest room and (according to our daughter) a disco/science lab.
It needed to be usable all year round. It also needed a shower room, sight lines over the whole garden and it needed to look good, as it’s a focal point from the living room. It was a long list of requirements for a small space but Executive Garden Rooms have met the challenge brilliantly and we could not be more pleased.
Ben completed a thorough site visit and talked us through the options available to us, sketching out some initial ideas. Alison paid close attention to what we wanted and refined the initial plans to make sure every aspect was right for us. She also answered our many questions promptly and made sure we had detailed information about the costs of different options, so that we could make informed decisions.
During the build, Ben kept the project on track through miserable weather conditions, parking/access problems and even when his van failed and had to be replaced mid-project. Everything was organised very efficiently. Ben and the team worked incredibly hard, made sure each detail was right and were careful to minimise the disruption for us and for our neighbours.
The project finished on schedule in three weeks and we are delighted with the results.

We would recommend EGR’s, without the slightest hesitation.
– V Williams, Crawley.